Development of the ibm.com Interactive Solution Marketplace (ISM)

A systems engineering case study

Eirik Hole, Dinesh Verma, Rashmi Jain, Vito Vitale, Paul Popick

Research output: Contribution to journalArticleResearchpeer-review

4 Citations (Scopus)

Abstract

IBM's ibm.com business unit contracted with IBM Global Services (IGS), another business unit of IBM, to develop their Interactive Solution Marketplace (ISM) application. ISM is a single point of entry on the ibm.com website for browsing and searching for a suite of solutions as opposed to individual software and hardware items. The first release of ISM experienced schedule and release content challenges. Development of the second release of ISM (ISM 2.0) became one of the first projects where IBM Global Services implemented their formal Systems Engineering and Architecture (SE&A) process. During the SE&A process implementation, particular emphasis was placed on requirements analysis and management, and on structured and scored reviews. This technical paper presents this implementation and the results in the form of a systems engineering case study. Implementation of the SE&A process during the development of ISM 2.0 was successful. ISM 2.0 was delivered on schedule, at 5% below projected cost, and it constituted the functionality and features expected and desired by stakeholders. Consensus on core stakeholder requirements was achieved early during project development, and the technical reviews allowed the team to identify and resolve key issues before proceeding into subsequent phases. This discipline, along with the expenditure of resources to develop quality requirements, greatly reduced project rework. As such, only one-tenth of anticipated defects were actually found and reported during testing. The quality of the deployed application was further validated by the minimal number of post-launch defects reported.

Original languageEnglish
Pages (from-to)78-92
Number of pages15
JournalSystems Engineering
Volume8
Issue number1
DOIs
StatePublished - 23 Sep 2005

Fingerprint

Systems engineering
Defects
Websites
Industry
Hardware
Testing
Costs

Keywords

  • Case study
  • Requirements management
  • Systems engineering management
  • Technical reviews

Cite this

Hole, Eirik ; Verma, Dinesh ; Jain, Rashmi ; Vitale, Vito ; Popick, Paul. / Development of the ibm.com Interactive Solution Marketplace (ISM) : A systems engineering case study. In: Systems Engineering. 2005 ; Vol. 8, No. 1. pp. 78-92.
@article{01658a0313e24e27bb9fa9fd7b80d3a3,
title = "Development of the ibm.com Interactive Solution Marketplace (ISM): A systems engineering case study",
abstract = "IBM's ibm.com business unit contracted with IBM Global Services (IGS), another business unit of IBM, to develop their Interactive Solution Marketplace (ISM) application. ISM is a single point of entry on the ibm.com website for browsing and searching for a suite of solutions as opposed to individual software and hardware items. The first release of ISM experienced schedule and release content challenges. Development of the second release of ISM (ISM 2.0) became one of the first projects where IBM Global Services implemented their formal Systems Engineering and Architecture (SE&A) process. During the SE&A process implementation, particular emphasis was placed on requirements analysis and management, and on structured and scored reviews. This technical paper presents this implementation and the results in the form of a systems engineering case study. Implementation of the SE&A process during the development of ISM 2.0 was successful. ISM 2.0 was delivered on schedule, at 5{\%} below projected cost, and it constituted the functionality and features expected and desired by stakeholders. Consensus on core stakeholder requirements was achieved early during project development, and the technical reviews allowed the team to identify and resolve key issues before proceeding into subsequent phases. This discipline, along with the expenditure of resources to develop quality requirements, greatly reduced project rework. As such, only one-tenth of anticipated defects were actually found and reported during testing. The quality of the deployed application was further validated by the minimal number of post-launch defects reported.",
keywords = "Case study, Requirements management, Systems engineering management, Technical reviews",
author = "Eirik Hole and Dinesh Verma and Rashmi Jain and Vito Vitale and Paul Popick",
year = "2005",
month = "9",
day = "23",
doi = "10.1002/sys.20022",
language = "English",
volume = "8",
pages = "78--92",
journal = "Systems Engineering",
issn = "1098-1241",
publisher = "John Wiley and Sons Inc.",
number = "1",

}

Development of the ibm.com Interactive Solution Marketplace (ISM) : A systems engineering case study. / Hole, Eirik; Verma, Dinesh; Jain, Rashmi; Vitale, Vito; Popick, Paul.

In: Systems Engineering, Vol. 8, No. 1, 23.09.2005, p. 78-92.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - Development of the ibm.com Interactive Solution Marketplace (ISM)

T2 - A systems engineering case study

AU - Hole, Eirik

AU - Verma, Dinesh

AU - Jain, Rashmi

AU - Vitale, Vito

AU - Popick, Paul

PY - 2005/9/23

Y1 - 2005/9/23

N2 - IBM's ibm.com business unit contracted with IBM Global Services (IGS), another business unit of IBM, to develop their Interactive Solution Marketplace (ISM) application. ISM is a single point of entry on the ibm.com website for browsing and searching for a suite of solutions as opposed to individual software and hardware items. The first release of ISM experienced schedule and release content challenges. Development of the second release of ISM (ISM 2.0) became one of the first projects where IBM Global Services implemented their formal Systems Engineering and Architecture (SE&A) process. During the SE&A process implementation, particular emphasis was placed on requirements analysis and management, and on structured and scored reviews. This technical paper presents this implementation and the results in the form of a systems engineering case study. Implementation of the SE&A process during the development of ISM 2.0 was successful. ISM 2.0 was delivered on schedule, at 5% below projected cost, and it constituted the functionality and features expected and desired by stakeholders. Consensus on core stakeholder requirements was achieved early during project development, and the technical reviews allowed the team to identify and resolve key issues before proceeding into subsequent phases. This discipline, along with the expenditure of resources to develop quality requirements, greatly reduced project rework. As such, only one-tenth of anticipated defects were actually found and reported during testing. The quality of the deployed application was further validated by the minimal number of post-launch defects reported.

AB - IBM's ibm.com business unit contracted with IBM Global Services (IGS), another business unit of IBM, to develop their Interactive Solution Marketplace (ISM) application. ISM is a single point of entry on the ibm.com website for browsing and searching for a suite of solutions as opposed to individual software and hardware items. The first release of ISM experienced schedule and release content challenges. Development of the second release of ISM (ISM 2.0) became one of the first projects where IBM Global Services implemented their formal Systems Engineering and Architecture (SE&A) process. During the SE&A process implementation, particular emphasis was placed on requirements analysis and management, and on structured and scored reviews. This technical paper presents this implementation and the results in the form of a systems engineering case study. Implementation of the SE&A process during the development of ISM 2.0 was successful. ISM 2.0 was delivered on schedule, at 5% below projected cost, and it constituted the functionality and features expected and desired by stakeholders. Consensus on core stakeholder requirements was achieved early during project development, and the technical reviews allowed the team to identify and resolve key issues before proceeding into subsequent phases. This discipline, along with the expenditure of resources to develop quality requirements, greatly reduced project rework. As such, only one-tenth of anticipated defects were actually found and reported during testing. The quality of the deployed application was further validated by the minimal number of post-launch defects reported.

KW - Case study

KW - Requirements management

KW - Systems engineering management

KW - Technical reviews

UR - http://www.scopus.com/inward/record.url?scp=24944521607&partnerID=8YFLogxK

U2 - 10.1002/sys.20022

DO - 10.1002/sys.20022

M3 - Article

VL - 8

SP - 78

EP - 92

JO - Systems Engineering

JF - Systems Engineering

SN - 1098-1241

IS - 1

ER -